A call about a home EV charger is rarely just one question. The caller just bought an electric vehicle, or is about to, and wants to know: can my house handle it, what will it cost, how long will it take, and do I need a permit?
These are good calls for an electrical contractor. The job is planned, not an emergency, and it often leads to more work: a panel upgrade, a garage circuit, or an outdoor outlet. But the caller is usually shopping around. The shop that answers clearly and sends a quote quickly tends to get the job.
Why the homeowner can't do this one themselves
This is the first thing worth knowing. The Technical Safety Authority of Saskatchewan (TSASK) homeowner electrical permit page says EV chargers must be installed by a licensed Saskatchewan electrical contractor. It lists generators, EV chargers and battery storage installations among the work that isn't eligible for a homeowner electrical wiring permit.
TSASK also says the electrical contractor should give a copy of the electrical permit before work begins. That shows the customer the contractor is licensed in Saskatchewan, following the law, approved to do the work, and obligated to fix things if there's an issue.
So when a handy caller asks if they can wire it themselves, the honest answer is no, and you can point them to the TSASK page instead of arguing. Offering the permit copy before the job starts is a simple way to look more professional than the next quote.
Explain Level 1 and Level 2 in plain words
Many callers don't know the difference yet. SaskPower's EV charging page lays it out in plain words, and it's a good page to text to customers:
- Level 1 uses a standard 120-volt wall outlet. SaskPower says it can take more than 24 hours to fully charge, and 1 hour of charging can get you 6 to 8 km of driving.
- Level 2 uses a 208 to 240-volt outlet, similar to the ones used for ovens and clothes dryers. SaskPower says 1 hour of charging can get you 25 to 100 km of driving.
SaskPower also says most EV charging happens at home, and it encourages people charging at home to charge after 8 pm. Mentioning it shows you know the local utility's advice.
The cost question
Callers will ask "how much?" before anything else. SaskPower's page gives a range you can point to: it lists the cost to install a Level 2 charger as C$1,000 to C$3,000, including the charger, electrician and permit costs. It adds that upgrades to the electrical panel and power service could range from a few hundred dollars to a few thousand, depending on the home's current power system.
That's helpful framing, not a quote. The honest answer on the phone is something like: "It depends on your panel and how far the charger is from it. If you send us a couple of photos, we can give you a real number." Our post on answering price questions on the phone has more ways to handle "how much?" without guessing.
Questions to ask on every EV charger call
A short set of questions lets you quote faster, and sometimes without a site visit:
- Do you already have the vehicle, or is it on order? When does it arrive?
- Do you have the charger already, or do you want us to supply one?
- Where will it go: attached garage, detached garage, or outside on the driveway?
- How far is that spot from the electrical panel?
- Can you text a photo of the panel with the door open, and the label inside?
- Do you own the home? Is it a house, townhouse or condo?
- Any other big loads planned, like a hot tub, a second EV or a garage heater?
- Name, callback number and address
The condo question matters. Shared buildings usually need the board or property manager involved, so it's better to know that up front.
Panel upgrades: be honest, not pushy
Some homes will need a panel or service upgrade before a Level 2 charger can go in. SaskPower tells people to contact an electrician to identify technical requirements, like location and whether an upgrade to the home's service or electrical panel is needed.
Explain why in plain words, put the charger and the upgrade on the quote as separate lines, and let the customer decide. People remember the contractor who explained things clearly, and they're more likely to call you for the next job.
Follow up on the quote
EV charger quotes often sit while the customer waits for their vehicle to arrive. A short, friendly follow-up a few days later is useful, not pushy: "Hi, it's [your company]. Just checking if you had any questions about the charger quote. Happy to walk through it." Our guide to electrician lead follow-up speed covers timing and wording.
And if you can't pick up because you're on a job, a quick text-back keeps the caller from moving on: "Sorry we missed your call. Is this about an EV charger? Reply with where you'd like it and a photo of your panel, and we'll call you back."
Where Ascent X fits
Ascent X answers every call, even at 2am, texts you the details, texts back anyone whose call gets missed, and sends review requests after the job. We can set your script to ask the EV charger questions above, so the charger location, panel details and timing are waiting in your texts when you call back. On Starter, you get the call answered and the details by text, and you book the job yourself. Plans from C$397/month, plus a one-time setup fee. The details are on our pricing page.
If you'd like help setting up an EV charger call script for your shop, ask for a free call back. We'll look at how your calls are covered today and what we'd change first.
Ascent X
We help Saskatoon home-service businesses (plumbing, HVAC, electrical and roofing) answer every call and book more jobs. Field Notes is where we write down what we learn.
